If you need to replace your membrane elements during the cold winter months, be sure to let them warm up before installation and running the equipment.
Bring the elements to a warm space and let them adapt to the ambient temperature for at least 24 hours. This is especially important for membrane elements stored or shipped in freezing temperatures. Once a warmed membrane is installed, start with a gentle initial flush at low pressure and moderate temperature.
Installing cold membrane elements and then immediately running the equipment can cause performance issues or even damage to the membrane. Exposing the cold membrane to warmer process fluid could make the membrane material flex unevenly. Telescoping and edge damage may occur, leading to loss of efficiency and possible element failure.
In addition, colder temperatures can cause the membranes pores to contract, affecting transmembrane pressure and flux. This can lead to early fouling that doesn’t resolve, even after the membrane element eventually warms up.
Additional Tip: If you suspect an element has been frozen “wet,” proceed with caution. Inspect it carefully, start it up conservatively and monitor the system for signs of trouble in the first hours of operation.
If you need help troubleshooting issues with your membrane filtration system, contact us! Call 410-822-6900 or by sending email to problem.solved@caloris.com to be connected with an engineer.
WATCH: Caloris has archived training webinars on membrane filtration and other process technology on our YouTube channel.